Skip to content
Roof Coatings

Distribution Warehouse Roof Restoration

A 60,000 sq ft aging TPO roof restored with a seamless silicone system — no tear-off, zero disruption to operations.

The Challenge

The facility’s 60,000 sq ft single-ply roof was leaking at dozens of seams and fasteners. A full tear-off would have shut down shipping operations for weeks and cost several times more than restoration.
Aging commercial TPO single-ply roof membrane showing weathered seams and fastener failure prior to restoration

Our Solution

We power-washed the entire roof, reinforced every seam and penetration with fabric- embedded base coat, then spray-applied a high-solids silicone membrane over the whole field. Work was staged section by section so the dock stayed open the entire time.
Technicians power washing commercial warehouse TPO roof substrate to prepare surface for silicone adhesion
A failing roof doesn’t always need a costly tear-off. Our spray-applied roof coating and foam systems restore the roof you already have — sealing every seam, fastener, and penetration into one waterproof, reflective membrane.
Spray polyurethane foam (SPF) adds R-value and slope for drainage, while a silicone or polyurea topcoat reflects the sun, lowers cooling costs, and shrugs off ponding water. The result is a renewable roof that can be re-coated instead of replaced.
We work on flat and low-slope commercial roofs, metal buildings, and residential structures — all without the mess, disruption, and landfill waste of a full replacement.

Project Timeline

01

Site Assessment

Inspection, measurements and moisture/adhesion testing to define scope.

02

Surface Preparation

Cleaning, grinding or blasting plus detailing of
cracks, seams and penetrations.

03

Coating Application

Spray-applied system installed to spec thickness by certified applicators.

04

Inspection & Handover

Quality checks, final walkthrough and warranty documentation.

Results

aging-tpo-commercial-warehouse-roof-before-restoration-twin-cities

Eliminated 100% of active leaks

Roof surface temperature dropped, cutting cooling costs

15-year renewable warranty issued

Zero operational downtime during the project

Project at a Glance

Location

Twin Cities, MN

Completed

2024

Category

Roof Coatings

Area

60,000 sq ft

Scope of Work

Roofing crew in protective suits positioning insulation board and staging spray lines on commercial warehouse roof in Twin Cities MN

Before & After

Why This System Was Chosen

Seamless protection

No seams or joints for water
or chemicals to get through.

Fast return to service

Rapid cure times keep downtime to a minimum.

Long-term value

Durable, warrantied finish that
outlasts traditional options.

The crew was professional, on schedule and left the site spotless. The finished
roof coatings work exceeded our expectations.

— Client, Twin Cities, MN

Why This System Was Chosen

Project Specs

Area

60,000 sq ft

System

Reinforced silicone

Duration

9 days

Warranty

15 years

Let’s scope it out and get you a quote.

More projects

A rooftop terrace waterproofed and finished with a decorative, slip-resistant…
Exposed structural steel armored with high-build polyurea to stop corrosion…
Leaking Class A motorhome roof encapsulated with a seamless reflective…
Ready when you are

Get an armor-tough coating quote today

Fully mobile, accredited, and insured — we bring the shop to your site. Tell us about your project and we’ll get you a fast, honest estimate.