The Challenge

A concrete secondary containment berm was cracking and no longer met containment requirements for the chemicals stored inside it.
Deteriorated concrete secondary containment berm with cracking and chemical erosion prior to polyurea lining

Our Solution

We abrasive-blasted the concrete, primed it, and sprayed a seamless chemical-resistant polyurea lining up the walls and over the floor, coving all transitions. The lining was holiday-tested for pinholes.
concrete-containment-berm-abrasive-blasting-surface-prep

Project Timeline

01

Site Assessment

Inspection, measurements and moisture/adhesion testing to define scope.

02

Surface Preparation

Cleaning, grinding or blasting plus detailing of
cracks, seams and penetrations.

03

Coating Application

Spray-applied system installed to spec thickness by certified applicators.

04

Inspection & Handover

Quality checks, final walkthrough and warranty documentation.

Results

industrial-containment-polyurea-lining-application-crew

Passed holiday/spark testing — pinhole free

Meets secondary containment code

Back in service the same day

Chemical-resistant to stored contents

Project at a Glance

Location

Rochester, MN

Completed

2024

Category

Tank & Containment Lining

Area

Chemical-resistant polyurea

Scope of Work

Completed secondary containment facility with fully cured seamless gray polyurea lining ready for operation in Rochester MN

Before & After

Why This System Was Chosen

Seamless protection

No seams or joints for water
or chemicals to get through.

Fast return to service

Rapid cure times keep downtime to a minimum.

Long-term value

Durable, warrantied finish that
outlasts traditional options.

The crew was professional, on schedule and left the site spotless. The finished
roof coatings work exceeded our expectations.

— Client, Twin Cities, MN

Why This System Was Chosen

Project Specs

Area

60,000 sq ft

System

Reinforced silicone

Duration

9 days

Warranty

15 years

Let’s scope it out and get you a quote.

More projects

A rooftop terrace waterproofed and finished with a decorative, slip-resistant…
Exposed structural steel armored with high-build polyurea to stop corrosion…
Leaking Class A motorhome roof encapsulated with a seamless reflective…
Ready when you are

Get an armor-tough coating quote today

Fully mobile, accredited, and insured — we bring the shop to your site. Tell us about your project and we’ll get you a fast, honest estimate.